Pile Dynamics Top Force Transducer
Pile Driving Analyzer
    Model: Pile Dynamics Top Force Transducer
    Country of Origin: US
    Use: Top force transducer method eliminates concrete build up or excavation on drilled concrete piles.
  • consult
Details Solution Applications Downloads Order

Top force transducer method eliminates concrete build up or excavation on drilled concrete piles. Using Pile Dynamics, Inc’s Top Force Transducer allows for quick set up. When used with the Pile Dynamics Analyzer – Dynamic Load Tester (PDA-DLT), the Top Force Transducer improves force accuracy and reduces labor costs. Force measurements may be taken via bolted on gages, load cell, dolly, or from ram measurements.

Advantages Include:
• No “windows” in casting provide more accurate force
• Area and modulus are identifiable
• Less pile preparation required
• Eliminates excavations
• Accelerometers mounted near top of pile, no longer requiring two diameter distance
• Eliminates errors due to bending
 

PDI offers Top Force Transducers for use with the Pile Dynamics Analyzer-Dynamic Load Tester (PDA-DLT) and the Pile Driving Analyzer (PDA), available in three sizes:

  • 91 cm (36″) – 4,000 tons (includes 8 strains)
  • 61 cm (24″) – 2,400 tons (includes 8 strains)
  • 41 cm (16″) – 1,150 tons (includes 8 strains)
Solution
Applications
Downloads
Order
Related Recommendations
WeChat
Micro-blog
Total Solution Provider for Advanced Civil Engineering Testing Instruments
  • 400-700-9998
  • Service Time : Monday to Sunday, 9:00-18:00
  • E-mail : hkmarketing@epc.com.hk
Copyright © 2008~2021 Earth Products China Ltd. all rights reserved. 粤ICP备12064742号 Domestic headquarters address:West Tower 2301, Fortune Plaza, No. 116, sports east road, Tianhe District, Guangzhou
Hong Kong Headquarter Address:12/F, Asia Trade Centre, 79 Lei Muk Road, Kwai Chung, Hong Kong
Home
Products
Solutions
About Us